The arrival of the first LNG carrier marked a historic moment for the LNG Canada project. This inaugural cargo initiated...
After starting out as a process engineer in a design office, Gabriela Victoria Santa Cruz Bustamante joined Entrepose Contracting and moved progressively from process engineering into engineering management, then into project management. Following experience as a Project Engineering Manager and in tender management, she reached a new milestone in January by becoming a Project Manager — the first woman to hold this position within VINCI Construction Grands Projets. She now leads the Cartagena GLP project as Project Director.
Project control relies on close monitoring of key indicators: budget in manhours, milestones and physical progress, non-conformities and client feedback, incident records and contractual performance. The levers are clear: robust planning, risk analysis backed by mitigation plans, fast trade-off decisions, systematic quality reviews, contractual control and transparency with stakeholders. HSE requirements are built in from the design phase, shaping both technical choices and execution plans. Interfaces with clients, suppliers and internal teams are coordinated through interface meetings, shared collaborative tools and Obeya-style rituals.
On one complex project, the engineering lessons-learned exercise was repositioned as a strategic asset rather than a documentation burden: the format was redesigned into two versions — a detailed report and a “top 3” summary — and supported by short, structured workshops highlighting each contributor’s input through success stories and lessons learned. The outcome: active team participation and a reference document reusable on subsequent projects.
At Entrepose Contracting, within the VINCI Group, responsibilities can broaden step by step. Gabriela Victoria Santa Cruz Bustamante extends that path through her commitment to gender diversity in engineering, via the Major Projects Women initiative and her role as a VINCI sponsor with Elles Bougent.

From a distance, a cryogenic tank looks like a large storage tank. Up close, it’s something else entirely: a critical industrial system where a design flaw can have consequences over forty years of operation. At −162 °C for LNG and as low as −253 °C

From 14 to 17 September 2026, Entrepose Contracting will take part in Gastech 2026 in Bangkok, one of the world’s leading events for the energy industry.
This new edition will provide an opportunity to meet clients, partners and project developers and discuss a key challenge: