Sines LNG regasification terminal

2 × 125,000 m³ LNG tanks

At a glance

Two 125,000 m³ full containment LNG tanks (9% Ni inner tank, post-tensioned concrete containment), Ø 80 m × H 41.7 m.
0
Cubic meters
0
years of construction
0
Delivery

Contract

EPC, consortium Entrepose Contracting / Tractebel / Somague (Entrepose co-lead partner, 18%)

Project owner

Construction

Nov. 2000 – Déc. 2003 (37 months)

Location

Sines, Portugal – import & regasification terminal
Project presentation

Context & challenges

The Sines LNG terminal, located on Portugal’s Atlantic coast 120 km south of Lisbon, entered service in 2004. Thanks to its privileged deep-water location with direct access to the Atlantic, Sines became a strategic hub for LNG reception.

Technical challenges & responses

  • Deep-water port: integration within the industrial port area.
  • European standards: design compliant with EN 1473 and BS 7777.
  • International consortium: Entrepose–Tractebel–Somague collaboration.