Balance of Plant Bonny

Train 6 auxiliary units

At a glance

Balance of Plant (BOP) for Train 6, including: Instrument Air Unit, Amine Oxidation Unit, Nitrogen Unit, Condensate Stabilisation Unit, and 132 kV network integration (OSBL).
0
years of construction

Contract

EPC, Entrepose Contracting as sole contractor

Project owner

Construction

Aug. 2006 – Sept. 2009 (37 months)

Location

Bonny Island, Rivers State, Nigeria
Project presentation

Context & challenges

In addition to the LNG/LPG/condensate tanks contract for Train 6, Entrepose Contracting was responsible for designing, procuring, and building the Balance of Plant (BOP)—all utilities and auxiliary units required to operate the new liquefaction train.

Technical challenges & responses

  • Multi-system integration: design of diverse process units.
  • Train 6 coordination: synergy with the tanks contract.
  • Operational performance: delivery of reliable facilities.

From construction to integrated EPC expertise for the energy of tomorrow